WORK DONE TO ENGINE:

  • Stripped and cleaned
  • Cylinder bores were honed
  • Crank journals were aligned honed
  • Crank was ground .010 under on both rod and main journals
  • Rods were honed and check for straightness
  • Pistons were cleaned and re-ringed
  • Cams were reground to better turbo profile then Parkerized
  • Heads were professionally rebuilt
  • Oil pan was modified to accept:
    • Oil drain-back spout for turbo
    • Screw in oil warmer
  • Intakes were cleaned and bead blasted