WORK DONE TO ENGINE:
- Stripped and cleaned
- Cylinder bores were honed
- Crank journals were aligned honed
- Crank was ground .010 under on both rod and main journals
- Rods were honed and check for straightness
- Pistons were cleaned and re-ringed
- Cams were reground to better turbo profile then Parkerized
- Heads were professionally rebuilt
- Oil pan was modified to accept:
- Oil drain-back spout for turbo
- Screw in oil warmer
- Intakes were cleaned and bead blasted
|